NCL: Jewel Cruise Ship

Main Summary:

In October 2018 we started work onboard NCL Jewel. We had two areas to complete in 14 days which included the Stardust Theatre on Deck 5,6 & 7, seating (fixed) 1040 passengers with an approx. area of 1010m2. The other area onboard was the Spinnaker Lounge on Deck 13, seating 372 passengers with an approx. area of 890m2.  The work involved: New carpets and refinished dance floor. New reupholstered banquette seating and fixed seating. New bar area with new integrated LED bar top and tiling. New blinds throughout area.

The work in the Stardust Theatre involved:

  • reupholstering of all seats – these were premanufactured before fitout. 
  • New carpet fitted.
  • New stair nosing fitted.

The work in the Spinnaker Lounge involved:

  • New reupholstered banquette seating and fixed seating.
  • New carpet and refinish of dance floor.
  • New bar area with new integrated LED bar top and new Corian shelfs along back bar.
  • New tiling
  • New blinds throughout area.
Date:
October 2018
Client:
NCL
Location of Work:
Singapore, Dry Dock
No. of Technicians working on Project:
60
Working Hours:
10,000
Duration:
14 Days
Project Value:
>£1m

The work in the Spinnaker Lounge involved:

  • New reupholstered banquette seating and fixed seating.
  • New carpet and refinish of dance floor.
  • New bar area with new integrated LED bar top and new Corian shelfs along back bar.
  • New tiling
  • New blinds throughout area.

Before Refit:


During Refit:


Completed Project: